Claims extracted
17
sentences that state something as happening or true
Uncertain
24%
4 of 17 hedged
("reportedly", "may", "according to")
Leaning
not political
takes no side on a contested political question
Publisher signals
59/100
The Independent's corrections and
hedging, across everything collected from it. Not a measure of accuracy.
Outlets on this story
102
World
Same framing elsewhere
1
articles that frame the event the way this one does
A Spanish passenger train was moving at a minimum of 99 mph (160 kmph) when it ran into a stationary train ahead of it, a preliminary report on the crash has found.
asserted
report → move → crash
The collision happened near the central Spanish town of Urda on Wednesday and killed at least 69 people.
The Independent Authority for the Technical Investigation of Accidents and Incidents (AITAT) put the Renfe train's speed at between 99 mph and 124 mph (160 kph and 200 kmph) at the moment of impact.
The exact figure will not be known until information is extracted from the train's black box, AITAT said.
asserted
AITAT → happen → box
The Civil Guard has received reports of 64 people missing in the crash, which is already Spain's deadliest train accident since 2013.
asserted
which → receive → 2013
It is unclear how many of those reported missing are among the bodies still to be identified, Reuters reported.
uncertain
Reuters → report → bodies
Forty-nine autopsies have been carried out so far, Esther Padilla, spokesperson for the Castilla-La Mancha regional government, said on state television network TVE.
asserted
Padilla → carry → TVE
Five people have been identified: three women and two men.
asserted
people → identify → ?
"Testing is proceeding slowly, although families will be contacted throughout the day so that they can come and collect their results," Padilla said on Friday.
asserted
Padilla → proceed → Friday
The crash followed another fatal accident in January involving the same rail companies on the same line.
asserted
crash → follow → line
It has reopened a debate about safety and maintenance on Spain's high-speed rail network, the most extensive in Europe.
asserted
It → reopen → Europe
The collision occurred after several trains were automatically stopped due to the failure of the automatic signalling system, after which the central control centre in Madrid took over.
asserted
centre → occur → Madrid
A train operated by state-owned Renfe was authorised to proceed even though there was a stationary Iryo-operated train ahead, according to Transport Minister Oscar Puente.
uncertain
train → operate → Puente
Audio of communications between the control centre and the train drivers, obtained by El Pais, showed a controller authorising the Renfe train to continue its journey at a normal speed.
asserted
train → obtain → speed
Puente said this disregarded a protocol to travel at no more than 40 kph in such circumstances.
asserted
this → say → circumstances
The audio also showed the controller authorised the Renfe train, carrying 379 passengers and seven crew, to renew its journey when it should have been the Iryo train in front, which carried 147 passengers and five crew, to proceed first, according to protocol.
uncertain
which → show → protocol
"The sequence of malfunctions, instructions, and actions eventually led to the collision, in the absence of the necessary mitigating barriers," according to the AITAT report.
uncertain
sequence → lead → report
You saw carriages completely burnt out, as if they’d exploded.
asserted
they → see → ?
What you see coming out were people in a very bad way, and others who start pulling out the bodies of the deceased and placing them right there next to where we were," Sebastian Herrero, who was travelling near the front of the Iryo train, said.
asserted
who → see → train