"Initial steps have included:
Inspecting the electrical equipment beneath the bridge for faults, exposed wiring or inadequate shielding.
Monitoring fish mortality on an ongoing basis to track whether the problem is continuing or worsening.
Coordinating with fish and wildlife biologists to study the health of the affected fish and test for electrical injury, disease or other causes."
Framing: mixed ·
First seen: 2026-09-06 ·
Last seen: 2026-09-06 ·
Spread: 1 articles