Canadair water-bomber builder feels heat of demand as wildfires rage around the world

Read the original at CBC News ↗
Cite

Bakx, K. (2026, August 16). Canadair water-bomber builder feels heat of demand as wildfires rage around the world. CBC News. https://www.cbc.ca/news/canada/calgary/bakx-de-havilland-canadair-calgary-super-scooper-alberta-wildfire-dhc-515-9.7307819?cmp=rss

Dated when The Aporia collected the article, usually within hours of publication. Check the original for its exact date and byline.

CBC News · collected 2026-08-16 · by Kyle Bakx

Quick Summary

De Havilland, the manufacturer of Canadair water-bomber planes, is increasing production to meet high demand as wildfires rage around the world. The company has begun making the planes again after acquiring the program from Bombardier in 2022, and a second production line may be on the way due to intense pressure from governments and opposition politicians. Two aircraft are currently under construction and are scheduled for delivery in early 2028. Canadian premiers and European leaders have expressed urgency in getting their hands on these planes amid shortages and aging fleets.
Written locally by qwen2.5:14b on 2026-08-16, using this article's own text rather than the other coverage of the same event (that is the story summary below).

AI analysis runs on qwen2.5:14b, locally

Story summary

De Havilland, a company based in Calgary, has begun rebuilding Canadair water-bomber aircraft again after acquiring the program. This decision comes as a result of increasing demand due to another brutal wildfire season affecting countries like Canada, the United States, and Europe. The company is currently producing two aircraft, with plans to deliver them in early 2028. The revived production line may expand to include a second manufacturing facility. Canadian premiers and European leaders are eager to acquire these planes due to current shortages and aging fleets of firefighting aircraft.

Written for “Wildfire Fighting Equipment Demand” on 2026-10-16, grounded in this article and the 0 other(s) covering the same event.

Story

📰 Wildfire Fighting Equipment Demand
Environment · 1 article(s) covering the same event.

Compared with similar articles

Nothing to compare against. No article is close enough to this one for the pipeline to have linked or judged the pair.
How this article was measured signals, leaning charts, publisher record, byline, topics and claims

Signals How these are calculated →

Claims extracted
51
sentences that state something as happening or true
Uncertain
6%
3 of 51 hedged ("reportedly", "may", "according to")
Leaning
withheld
no quote in the article backed the model's score
Publisher signals
77/100
CBC News's corrections and hedging, across everything collected from it. Not a measure of accuracy.
Outlets on this story
1
Environment
Same framing elsewhere
1
articles that frame the event the way this one does
Analyzed 2026-08-16 · how these are computed

How this is being covered How these are calculated →

Article leaning vs. publisher reliability
Source leaning vs. consistency

Publisher

CBC News · 1290 article(s) · 4 correction(s) detected
Running correction rate · 4 correction(s)

Who wrote this

Kyle Bakx
4 article(s) here · 1 carrying a prediction
🔮 Ottawa wants to expand the oilsands, but the industry's wastewater problem will grow with it
🔮 On Thursday, the federal government is expected to declare the project is in the national interest.
🔮 Former Alberta Treasury Board senior manager calls plan 'magic' by omitting major expenses An independence organization is the latest group to try to price out what it might cost should Alberta decide in the future to become a sovereign nation.
🔮 De Havilland has begun making the firefighting aircraft again — and a 2nd production line could be on the way
Also by Kyle Bakx
Nothing else under this byline is closely related to this article, so these are simply their most recent.

Topics

Calgary Canada Canadair Canadian De Havilland

Subjects

De Havilland ORG · 6× Canadair ORG · 5× Calgary GPE · 4× Canada GPE · 3× Canadian NORP · 3× Bombardier ORG · 1× European NORP · 1× France GPE · 1× Spain GPE · 1× the United States GPE · 1×

Narrative

" The federal government is committed to protecting Canadians and strengthening the national capacity to respond to "increasingly intense wildfire seasons," said Soraya Lemur, the press secretary for Eleanor Olszewski, the federal minister for emergency management.
framing: assertive · carried by 1 article(s) · first seen 2026-08-16
🔮 De Havilland has begun making the firefighting aircraft again — and a 2nd production line could be on the way

Claims (51 extracted, 3 hedged)

Canadair water-bomber builder feels heat of demand as wildfires rage around the world asserted
wildfires → feel → world
De Havilland has begun making the firefighting aircraft again — and a 2nd production line could be on the way uncertain
line → begin → way
As Canada, the United States and Europe grapple with another brutal wildfire season, pressure is building on the manufacturer of the Canadair "Super Scooper" water bombers to increase production, and on the federal government to bulk order the planes. asserted
pressure → grapple → planes
Calgary-based De Havilland is taking the rare step of reviving production of the Canadair after acquiring the water bomber program. asserted
Havilland → base → program
The planes had been built by Bombardier up until 2015. asserted
planes → build → 2015
The world-renowned aircraft are built by hand with the majority of assembly in Calgary, from a supply chain across the country. asserted
aircraft → renowne → country
The revived production line was announced in 2022 and is beginning to produce results as the first two aircraft are taking shape and on schedule to be completed and delivered in early 2028. asserted
aircraft → revive → 2028
Canadian premiers and European leaders are desperate to get their hands on those aircraft amid current shortages and aging fleets. asserted
premiers → get → shortages
First produced in the 1960s, the Canadair amphibious firefighting plane was designed for fighting vast fires in the Canadian wilderness. asserted
plane → produce → wilderness
Its unique design allowed it to navigate narrow canyons at low altitude and scoop thousands of litres of water directly from lakes, rivers and oceans in seconds. asserted
it → allow → seconds
The aircraft was purpose-built as a firefighting aircraft, as opposed to other planes and helicopters that are often modified to be able to carry water. asserted
that → build → water
The latest version of the Super Scooper will be remarkably similar to past Canadair aircraft, with high wings spanning 30 metres, a 6,100-litre water tank, and the distinct yellow and red exterior. asserted
version → span → metres
In recent weeks, opposition politicians in France and Spain have criticized governing leaders for not having enough operational Canadairs, leading to a lack of preparedness to tackle extreme weather and control wildfires. asserted
politicians → criticize → wildfires
Some provincial premiers have lamented the lack of new water bombers for consecutive summers, including Manitoba's Wab Kinew, who said in June 2025, "We could use every water bomber we can get our hands on." The political heat is being felt by De Havilland. uncertain
heat → lament → Havilland
We know that this is a very important aircraft not only for Canada but for the world. asserted
this → know → world
We take our responsibility to our customers and the people they serve very seriously," said Neil Sweeney, the company's vice-president of corporate affairs, in an interview inside the Calgary assembly plant. asserted
Sweeney → take → plant
Demand is so high that De Havilland is considering whether to build a second production line, even as it works to produce its first aircraft at existing facilities. asserted
it → consider → facilities
In recent weeks, Alberta Premier Danielle Smith said she is working with her provincial counterparts and the federal government to support a firm order by Ottawa, which would give the aircraft manufacturer enough certainty to begin constructing a second line. asserted
which → say → line
"We told the Canadian government that if they made an order of 50 aircraft," said Sweeney, then, "we would build a second line tomorrow." asserted
we → tell → line
Currently, De Havilland — which produces a range of aircraft and employs about 4,000 people predominantly in Calgary, Ontario and Victoria — will be able to produce about 10 water bombers annually at full capacity. asserted
which → produce → capacity
A second production line would eventually increase output to 20 each year. asserted
line → increase → 20
De Havilland has existing orders for 38 water bombers. asserted
Havilland → have → bombers
The Canadair require tens of thousands of parts, of which about 80 per cent are made in Canada. asserted
cent → require → Canada
Some of the equipment on the production line dates back to the 1960s. asserted
Some → date → 1960s
There is a need for a second and even a third production line for the Canadairs, said John Gradek, an aviation expert at McGill University. asserted
Gradek → be → University
Several countries are panicking because of the wildfire situation and the lack of new water bombers, said Gradek, who estimates hundreds of the aircraft would be snatched up if there were any available. asserted
hundreds → panic → aircraft
Demand is coming from around the world, he said, because of a warming planet. asserted
he → come → planet
"Right now we're stuck in a situation where the demand is huge," said Gradek. asserted
Gradek → stick → situation
"The world is looking for more water bombers, newer water bombers, and we're not ready. asserted
we → look → bombers
"Every continent on the Earth, from Australia to Europe to South America to North America — the world is burning up. asserted
world → burn → America
We need equipment to be able to fight those fires and fight those fires effectively. asserted
We → need → fires
Canadair water bombers have proven their effectiveness over the last 60 years, no doubt about it. asserted
bombers → prove → it
" De Havilland did not provide the price tag for a Canadair, although the figure is believed to be about $80 million per aircraft, based on government announcements. asserted
figure → provide → announcements
Threat of potential competition If De Havilland is unable to respond to the growing demand for water bombers, there is the risk that foreign companies may develop their own rival firefighting aircraft. uncertain
companies → respond → aircraft
Designing a new aircraft would take several years, but it's a realistic threat to Canadian manufacturing jobs, said Gradek. asserted
Gradek → design → jobs
"Whether it's Russia, whether it's France, whether it's the U.K., whether it's Greece or whoever — they're going to come out and they're going to come out fast and furious," he said. asserted
he → go → ?
The warning comes at a time when the federal government is focused on improving the national economy and bolster domestic manufacturing. asserted
government → come → manufacturing
"We have the best scooping aircraft in the world, bar none. asserted
We → have → none
We've had it for 60 years. asserted
We → have → years
But having it for another 60 years is not guaranteed," said Sweeney. asserted
Sweeney → have → years
…and 11 more, not listed.
💬Give feedback
🕘History 🎫Support