Photo via The Straits Times

US aviation authority delays Boeing 737 MAX 10 certification over software issue

Read the original at The Straits Times ↗
Cite

The Straits Times. (2026, September 29). US aviation authority delays Boeing 737 MAX 10 certification over software issue. The Straits Times. https://www.straitstimes.com/world/united-states/us-aviation-authority-delays-boeing-737-max-10-certification-over-software-issue

Dated when The Aporia collected the article, usually within hours of publication. Check the original for its exact date and byline.

The Straits Times · collected 2026-09-29 · by The Straits Times

Quick Summary

The US Federal Aviation Administration (FAA) announced on September 28 that it will delay certifying Boeing’s 737 MAX 10 due to a newly discovered software issue affecting flight guidance during certain landing scenarios. This decision comes after Boeing informed operators of the potential problem and stated they were working on a software update. The FAA did not provide an estimate for how long this certification process would be delayed, emphasizing that the issue increases pilot workload in specific situations but is not considered a safety concern by some airlines like WestJet.
Written by AI on 2026-09-29, from this article's own text only (the story summary below draws on all the coverage).
See how they differ ↓

AI analysis

Story summary

On September 28, the US Federal Aviation Administration (FAA) announced it would delay certifying the Boeing 737 MAX 10 due to a newly discovered software issue. This decision came after Boeing disclosed that a specific software glitch could cause flight control systems to shut off unexpectedly during certain landing scenarios, increasing pilot workload in critical moments like go-arounds. As a result, Boeing's shares fell by 6.9%, reflecting investor concerns over additional delays for the aircraft model. FAA Administrator Bryan Bedford stated at Reagan Washington National Airport that certification would be postponed until the agency was confident there were no unresolved issues with the software. The delay represents another setback for Boeing as it competes against Airbus in the single-aisle market segment, a key area for regaining lost ground and boosting sales.

Written for “Boeing 737 MAX 10 Delay” on 2026-11-18, grounded in this article and the 1 other(s) covering the same event.

How they differ

2 outlets covered “Boeing 737 MAX 10 Delay”.

What each outlet says

One AI summary per outlet of its latest article on this story, written from that article alone and checked against it. Open the article for the outlet's own words.

The Straits TimesThis outlet29 Sep

The US Federal Aviation Administration (FAA) announced on September 28 that it will delay certifying Boeing’s 737 MAX 10 due to a newly discovered software issue affecting flight guidance during certain landing scenarios. This decision comes after Boeing informed operators of the potential problem and stated they were working on a software update. The FAA did not provide an estimate for how long this certification…

US aviation authority delays Boeing 737 MAX 10 certification over software issue (this article)
CBS News29 Sep

The Federal Aviation Administration has postponed its approval for the Boeing 737 MAX 10 due to a potential software issue that could lead to an unexpected shutdown of the aircraft's flight control system. Boeing disclosed this glitch, indicating it may impact the certification process. Reporter Kris Van Cleave covers the story.

FAA delays Boeing 737 MAX 10 approval due to software glitch →

Compared with similar articles

This article reads unscored and hedges 16% of its claims. Each row says how that neighbour differs.
CBS News
Hedges 1 of 3 claims Outlet record 67/100
The Hindu
Hedges 3 of 11 claims Outlet record 60/100
“Article A reports on Boeing discovering a software issue in its MAX planes, while Article B discusses the FAA delaying certification of the MAX 10 due to the same software issue. Although related, they describe different specific events occurring at distinct times.”
New York Post
Hedges 5 of 19 claims Outlet record 66/100
“The articles describe related but distinct events: one reports on a software glitch discovered by Boeing, while the other describes the FAA's decision to delay certification of the MAX 10 due to this issue.”
The Straits Times
Hedges 3 of 12 claims Outlet record 64/100
“Article A reports on a specific software glitch affecting the landing navigation feature of the 737 Max, while Article B discusses the FAA delaying certification for the 737 MAX 10 due to a software issue. Although related, they describe different occurrences.”
The Straits Times
Hedges 4 of 15 claims Outlet record 64/100
“The articles discuss related issues with Boeing's 737 MAX 10 certification but describe different points in time: one delay due to a software issue and another update clearing the way for approval.”

Story

Boeing 737 MAX 10 Delay
Technology · 2 article(s) covering the same event. See how they differ ↑
How this article was measured signals, leaning charts, publisher record, byline, topics and claims

Signals How these are calculated →

Claims extracted
19
sentences that state something as happening or true
Uncertain
16%
3 of 19 hedged ("reportedly", "may", "according to")
Leaning
not political
takes no side on a contested political question
Publisher signals
64/100
The Straits Times's corrections and hedging, across everything collected from it. Not a measure of accuracy.
Outlets on this story
2
Technology
Same framing elsewhere
1
articles that frame the event the way this one does
Analyzed 2026-09-29 · how these are computed

How this is being covered How these are calculated →

Article leaning vs. publisher reliability
Source leaning vs. consistency

Publisher

The Straits Times · 5439 article(s) · 7 correction(s) detected
Running correction rate · 7 correction(s)

Who wrote this

The Straits Times
3780 article(s) here · 1 carrying a prediction
French justice minister says hard-left leader Melenchon could win presidential election
Officials at NASA's Jet Propulsion Laboratory in California will have to wait about a day to get a signal from the probe, confirming it has reached this distance.
China will provide additional tariff relief for around C$400 million in Canadian exports, including frozen pork cuts and fish and seafood.
Reuters could not independently verify the reports.
While it didn't regain much territory, it thwarted part of Russia's pincer advance on the "fortress belt" of eastern cities that could be critical to the war's outcome.
“We will always protect our national interests and ensure that there are guardrails in place,” she added, when asked about the prospect of Chinese automakers stepping up investment in production plants in Canada as well as in the North American country’s energy sector.
Trump calls Venezuela an ‘acquisition,’ hails US energy supply AI generated MANILA – US President Donald Trump referred to Venezuela as an “acquisition” while touting an increasing supply of US energy he said will benefit American allies including the Philippines.
Trump then pointed to Takaichi, saying, “And she may be even tougher.”
Rubio says no imminent threat to Washington after report of possible Iranian dirty bomb plot AI generated MANILA/ WASHINGTON – US Secretary of State Marco Rubio said on Nov 18 he did not think there was any imminent threat to the US capital, when asked about a CNN report citing US intelligence assessments on the possibility that Iran may be planning an attack involving a so-called dirty bomb in Washington.
Instantly recognisable for the red spots it generates on an infected person’s body, measles also causes fever, respiratory symptoms, and in some cases more serious complications such as pneumonia and brain inflammation, which can lead to severe long-term health problems or even death. ‘The worst illness’ Jones said measles patients are usually “extremely miserable”, adding “it is often the worst illness the child will have ever gone through in their life”.
Also by The Straits Times
Nothing else under this byline is closely related to this article, so these are simply their most recent.
All 3780 articles by The Straits Times →

Topics

737 MAX 737 MAX 10 Boeing FAA the MAX 10

Subjects

Boeing ORG · 7× FAA ORG · 6× Bedford PERSON · 2× GE Aerospace ORG · 2× Reuters ORG · 2× WestJet ORG · 2× Airbus ORG · 1× Bryan Bedford PERSON · 1× The US Federal Aviation Administration ORG · 1× WASHINGTON GPE · 1×

Narrative

Boeing shares closed down 6.9% over concerns about further delays to the MAX 10, a key aircraft in Boeing’s effort to regain ground lost to Airbus in the lucrative single-aisle market. “We will be delaying the 10 until we’re satisfied that we don’t have an issue here,” FAA Administrator Bryan Bedford told reporters at an event at Reagan Washington National Airport.
framing: assertive · carried by 1 article(s) · first seen 2026-09-29
The US Federal Aviation Administration (FAA) said on Sept 28 it will hold off certifying Boeing’s long-delayed 737 MAX 10 until a newly-disclosed software issue is resolved, the latest setback to the planemaker’s efforts to bring the largest version of its best-selling jet to market.
2026-09-29 · The Straits Times
US aviation authority delays Boeing 737 MAX 10 certification over software issue · assertive framing

Claims (19 extracted, 3 hedged)

US aviation authority delays Boeing 737 MAX 10 certification over software issue WASHINGTON - asserted
authority → delay → issue
The US Federal Aviation Administration (FAA) said on Sept 28 it will hold off certifying Boeing’s long-delayed 737 MAX 10 until a newly-disclosed software issue is resolved, the latest setback to the planemaker’s efforts to bring the largest version of its best-selling jet to market. asserted
issue → say → market
Boeing said on Sept 26 a software issue affecting certain 737 MAX aircraft could prevent pilots from accessing automated flight guidance during a specific landing scenario. uncertain
issue → say → scenario
The company said it had informed operators and was developing a software update to permanently address the problem. asserted
it → say → problem
Boeing shares closed down 6.9% over concerns about further delays to the MAX 10, a key aircraft in Boeing’s effort to regain ground lost to Airbus in the lucrative single-aisle market. “We will be delaying the 10 until we’re satisfied that we don’t have an issue here,” FAA Administrator Bryan Bedford told reporters at an event at Reagan Washington National Airport. asserted
Bedford → close → Airport
He declined to estimate the length of the delay. asserted
He → decline → delay
The FAA said the software version can increase pilot workload when doing a go-around, where a pilot aborts a landing attempt, applies power, and climbs back into the sky to try to land again. asserted
pilot → say → sky
The FAA said earlier it planned to convene a Corrective Action Review Board to investigate the issue. However, the board is not likely to take place before next week at the earliest, two sources told Reuters. asserted
sources → say → Reuters
The review by the US regulator will test whether the software poses an unreasonable risk to safety, which could lead to more months of rework before the MAX 10 could get certified, which was widely expected to take place in October. uncertain
which → test → October
Not a safety concern However, WestJet, the Canadian carrier backed by Onex Corp and one of the airlines operating the software on its 737 MAX fleet, said it had not experienced any in-service issues and did not view the matter as a safety concern. asserted
it → back → concern
“We have standard operating procedures and training to mitigate this type of event,” the Calgary-based carrier said in a statement. asserted
carrier → have → statement
Three WestJet 737 MAX pilots, who spoke on condition of anonymity, said they were not aware of any issues with the software when performing missed approaches, a rare procedure. asserted
they → speak → approaches
Bedford said the software was supplied by jet engine maker and supplier GE Aerospace, and suggested a fix could be developed relatively quickly. “I think in this particular case, due to the focus that’s on it, GE may try to get this software correction in much quicker,” Bedford said. uncertain
Bedford → say → correction
I don’t know.” asserted
I → know → ?
Despite the bug, pilots maintained control, unlike undisclosed 737 MAX automatic flight control software that was involved in two crashes in 2018 and 2019, he said. asserted
he → maintain → 2018
GE Aerospace did not immediately respond to a request for comment. asserted
Aerospace → respond → comment
“We continue to follow the lead of the FAA as we work through the certification process,” a Boeing spokesperson said. asserted
spokesperson → continue → process
Alaska Airlines and United Airlines said none of their aircraft currently use the affected software. asserted
none → say → software
United said it is not accepting deliveries of aircraft equipped with the software version under review, while Alaska said it is working with Boeing and the FAA as they evaluate the issue. asserted
they → say → issue
Give feedback · no sign-in needed

No sign-in needed for now. Your note is sent without a name, so it cannot be answered.

History Support