Flood victims wait four years for repairs to homes

Read the original at ABC News (AU) ↗
ABC News (AU) · collected 2026-09-27 · by Amelia Walters

Quick Summary

Homes damaged by the River Murray flood in 2022 are still awaiting repairs, with Jamie Bruce sleeping on a fold-out couch for nearly four years while waiting for their home to be fixed. Master Builders Australia reports a national shortage of 141,000 skilled workers, contributing to delays in reconstruction efforts. The article highlights the family's struggles with insurance and finding reliable tradespeople, emphasizing the mental and physical toll this has taken on them.
Written locally by qwen2.5:14b on 2026-09-27, using this article's own text rather than the other coverage of the same event (that is the story summary below).

AI analysis runs on qwen2.5:14b, locally

Story summary

In 2022, homes affected by the River Murray flood in South Australia are still awaiting repairs almost four years later. The flood was one of the largest, peaking at 186 gigalitres per day and causing significant damage to Jamie Bruce's home, including destroying their bedroom. Since then, Bruce has been sleeping on a fold-out couch while waiting for repairs. Nationally, there is a shortage of 141,000 skilled workers, exacerbating the delays in rebuilding efforts. The SA and federal governments have committed funding to help cover travel expenses for rural apprentices to keep them employed, aiming to address labor shortages impacting reconstruction timelines.

Written for “Home Repairs Delayed After Floods” on 2026-10-04, grounded in this article and the 0 other(s) covering the same event.

Signals How these are calculated →

Claims extracted
49
claim-shaped sentences
Uncertain
6%
3 of 49 hedged
Leaning
not political
takes no side on a contested political question
Correction & hedging signals
60.8
corrections and hedging in what we collected; not a measure of accuracy
Outlets on this story
1
Environment
Narrative spread
1
articles carrying this framing
Analyzed 2026-09-27 · how these are computed

Story

📰 Home Repairs Delayed After Floods
Environment · 1 article(s) covering the same event.

How this is being covered How these are calculated →

Article leaning vs. publisher reliability
Source leaning vs. consistency

Compared with similar articles

This article reads unscored and hedges 6% of its claims. Each row says how that neighbour differs.
ABC News (AU)
⚖️ leaning not scored 🔴 8% hedged 2 of 25 📰 publisher trust 61
“The articles describe different events: one about a promise for a new levee in Katherine after recent flooding, and another about flood victims waiting for home repairs from floods in South Australia in 2022.”

Publisher

ABC News (AU) · 1998 article(s) · 2 correction(s) detected
Running correction rate · 2 correction(s)
2026-09-15
Canberra man posed as teenage girl to obtain child abuse material
2026-09-07
'Her career's finished': Fugitive Sydney developer's daughter avoids jail

Who wrote this

Amelia Walters
2 article(s) here · 1 carrying a prediction
🔮 Frustrated by the delay for their insurer to send out a tradie, the family took a payout so they could source their own workers. "[I had] so many phone calls where they would never come back to me," she said.
2026-09-27 · assertive framing · Flood victims wait four years for repairs to homes
🔮 He said eligible growers would be able to access loans of up to $500,000, with no principal or interest repayments required for the first two years.
Also by Amelia Walters
Nothing else under this byline is closely related to this article, so these are simply their most recent.

Topics

ABC Riverland Armageddon Master Builders Australia South Australia's

Subjects

Bruce PERSON · 4× ABC Riverland ORG · 3× Amelia Walters PERSON · 3× Jamie PERSON · 3× Alix Pearce PERSON · 2× Jamie Bruce PERSON · 2× Kay Bruce PERSON · 2× Master Builders Australia ORG · 1× Rob Bruce PERSON · 1× South Australia's GPE · 1×

Narrative

"We're seeing this [rise] in materials and labour costs, too; for example, roof tiles have gone up 77 per cent over the last five years." Alix Pearce says governments need to increase investment in resilience to build stronger homes.
framing: assertive · carried by 1 article(s) · first seen 2026-09-27
🔮 Frustrated by the delay for their insurer to send out a tradie, the family took a payout so they could source their own workers. "[I had] so many phone calls where they would never come back to me," she said.
2026-09-27 · ABC News (AU)
Flood victims wait four years for repairs to homes · assertive framing

Claims (49 extracted, 3 hedged)

In short: Homes affected by the River Murray flood event in 2022 are still waiting for repairs. asserted
Homes → affect → repairs
The SA and federal governments have committed funding to help cover the travel expenses of rural or regional apprentices travelling long distances to keep them on the job. asserted
governments → commit → job
For almost four years, Jamie Bruce has been sleeping on a fold-out couch. asserted
Bruce → sleep → couch
Their family home at Morgan was inundated by floodwater during South Australia's third-largest River Murray flood in 2022, just 10 months after moving in. asserted
home → inundate → 2022
It destroyed the lower level of the home, washing away Jamie's bedroom and identity. " asserted
It → destroy → bedroom
I was just starting to decorate the walls and get things to a state where the space was me," they said. asserted
they → start → state
Jamie Bruce is still sleeping on a fold-out couch waiting for the house repairs to be finished. (ABC Riverland: Amelia Walters) asserted
repairs → sleep → couch
"Then I watched my little dragons that were on the wall slowly disappear under the water. asserted
that → watch → water
Floodwaters peaked at 186 gigalitres a day, leaving only concrete and wooden cladding behind in Jamie's bedroom. asserted
Floodwaters → peak → bedroom
"It looks like Armageddon in here,"Jamie said. asserted
It → look → Armageddon
The family's staircase is being held up by two wooden panels. asserted
staircase → hold → panels
Tradie and insurance 'nightmare' Jamie's mum, Kay Bruce, describes the first 12 months following the flood as "a nightmare". asserted
mum → describe → nightmare
The family spent five of those months living out of a friend's large tin shed. asserted
family → spend → shed
"Thinking about [that time] now still brings tears to my eyes," Ms Bruce said. asserted
Bruce → think → eyes
Frustrated by the delay for their insurer to send out a tradie, the family took a payout so they could source their own workers. "[I had] so many phone calls where they would never come back to me," she said. uncertain
she → send → me
Kay Bruce says the situation has taken a mental and physical toll on her family. asserted
situation → say → family
"I've got a spreadsheet, and it shows just name after name after name." asserted
it → get → name
Despite trying to project-manage the rebuild, after three years Ms Bruce was still yet to have a tradesperson follow through and do the job. asserted
tradesperson → try → job
"I can't understand when people make arrangements to come and do work or make quotes and then just don't turn up, don't phone you, don't text you," she said. asserted
she → understand → you
"I feel like we are just treading water and are in limbo … we just want to get back to some resemblance of how things were." asserted
things → feel → resemblance
Her husband, Rob Bruce, said that while the process had been exhausting for the whole family, it came with a level of guilt. asserted
it → say → guilt
"We have friends that lost their entire place and they're still in the caravan park whilst their houses are being built," Mr Bruce said. " asserted
Bruce → have → park
We'd feel bad knowing that our place was all done and they're still in the caravan park waiting." asserted
they → feel → park
With the cost of materials to build a home spiking in recent years, Mr Bruce said the family felt trepidation about the future. asserted
family → build → future
"It worries me that it's going to be a hit for us [to rebuild]," he said. asserted
he → worry → me
Material costs through the roof The cost to build a new home in South Australia has risen by almost 40 per cent since 2021, according to the Insurance Council of Australia. uncertain
cost → build → Australia
It is something social policy, climate and international engagement manager Alix Pearce says is a growing national issue. asserted
Pearce → say → ?
"The average cost to build a home has increased 30 per cent nationally over the last five years, which considerably outstrips inflation at 24 per cent,"she said. asserted
which → build → cent,"she
"We're seeing this [rise] in materials and labour costs, too; for example, roof tiles have gone up 77 per cent over the last five years." Alix Pearce says governments need to increase investment in resilience to build stronger homes. asserted
governments → see → homes
(ABC News: Greg Bigelow) Ms Pearce said state and federal governments needed to do more to uplift their investment in housing resilience and address tradie shortages across the country. asserted
governments → say → country
"The cost of extreme weather is rising considerably … last year disasters drove $4 billion worth of insured losses,"she said. " asserted
disasters → rise → losses,"she
We need to see increased investment in trades and construction, particularly in those high-risk areas in Australia. asserted
We → need → Australia
In South Australia, about 20,000 workers are required over the next five years to meet major project and housing demand, according to a state government spokesperson. uncertain
workers → require → spokesperson
The spokesperson said it has committed $11 million over the next two years, alongside the federal government, to help the travel expenses of rural or regional apprentices travelling long distances to keep them on the job. asserted
it → say → job
Master Builders Australia projects a worker shortage of 935,600 by 2035. asserted
Australia → project → 2035
"The new measure will support an additional 400 regional apprentices and trainees to undertake their training," the statement said. asserted
statement → support → training
It also said it is building three new technical colleges, including in Murray Bridge, and a new TAFE Trades Workshop in Mount Barker, which aims to support 1,200 additional construction trade apprentices. asserted
which → say → apprentices
Andrew Johnson says council reserves and infrastructure are still being rebuilt and revegetated following the flood event. asserted
reserves → say → event
Mid Murray Council chief executive Andrew Johnson said any commitment is welcome as his regional community continues to recover from the 2022-23 flood while experiencing trade shortages. asserted
community → say → shortages
"We have a number of open spaces and reserves along the river that still need to be rehabilitated [post-flood] and still need irrigation systems put back in," he said. asserted
he → have → river
…and 9 more, not listed.
💬Give feedback
🕘History 🎫Support