NexGold Intersects 14.07 g/t Gold over 7.0 Metres, 9.76 g/t Gold over 8.0 Metres and 2.84 g/t Gold over 13.0 Metres at the Goldlund Deposit, Ontario

Read the original at Toronto Star ↗
Toronto Star · collected 2026-09-23 · by GlobeNewswire, Inc.

Quick Summary

NexGold Mining Corp. announced detailed results from its diamond drilling program at the Goldlund Deposit in Ontario, reporting significant gold intercepts including 14.07 grams per tonne (g/t) over 7.0 meters and 9.76 g/t over 8.0 meters. The company has completed approximately 31,971 meters of drilling as part of an expanded 35,000-meter program aimed at infilling and testing the extension of mineralization within Zone 4 of the Goldlund Deposit.
Written locally by qwen2.5:14b on 2026-09-23, using this article's own text rather than the other coverage of the same event (that is the story summary below).

AI analysis runs on qwen2.5:14b, locally

Story summary

NexGold Mining Corp., a company listed on the TSXV and OTCQX under symbols NEXG and NXGCF respectively, announced significant gold assay results from its ongoing drilling program at the Goldlund Deposit in Ontario. The recent drilling campaign includes 3,603 meters of diamond drilling across 10 drill holes (GL-26-031 to GL-26-040). Notably, the company reported intersections such as 14.07 g/t gold over 7.0 metres and 9.76 g/t gold over 8.0 metres, both of which include higher-grade intervals like 95.70 g/t gold over 1 metre and 74.10 g/t gold over 1 metre. Kevin Bullock, NexGold's President, CEO, and Director, expressed satisfaction with these results, indicating they support the company’s objective to refine its geological model and potentially inform future mineral resource assessments at Goldlund.

Written for “Gold Mining Discovery Canada” on 2026-10-05, grounded in this article and the 0 other(s) covering the same event.

Signals How these are calculated →

Claims extracted
42
claim-shaped sentences
Uncertain
14%
6 of 42 hedged
Leaning
not political
takes no side on a contested political question
Correction & hedging signals
63.3
corrections and hedging in what we collected; not a measure of accuracy
Outlets on this story
1
Economy/Business
Narrative spread
1
articles carrying this framing
Analyzed 2026-09-23 · how these are computed

Story

📰 Gold Mining Discovery Canada
Economy/Business · 1 article(s) covering the same event.

How this is being covered How these are calculated →

Article leaning vs. publisher reliability
Source leaning vs. consistency

Compared with similar articles

Nothing to compare against. No article is close enough to this one for the pipeline to have linked or judged the pair.

Publisher

Toronto Star · 5200 article(s) · 17 correction(s) detected
Running correction rate · 17 correction(s)
2026-10-03
Tennessee's prisons chief is resigning after failed execution of Christa Pike
2026-09-28
Organizations call for Action to End the Deaths of Indigenous People in Custody
2026-09-27
Police memorial recognizes six officers killed in the line of duty in 2026
2026-09-27
UPDATE: WSP to host Power & Energy-focused investor event virtually only
2026-09-26
News Clarification for Sept. 27
2026-09-26
Former federal public servant seeks better pensions for injured workers
2026-09-25
News Corrections for Sept. 25
2026-09-25
She has not been charged. But the Project South allegations have branded her with a 'scarlet letter'
2026-09-24
Correction
2026-09-23
MULTIMEDIA UPDATE: Smith+Nephew launches the new EVOS™ PELVIC Plating System at the 2026 Orthopedic Trauma Association (OTA) Annual Meeting, expanding the EVOS Plating Platform for pelvic and acetabular fracture management
2026-09-22
Costa Rican man complained of lack of care for diabetes before his death in ICE custody, family says
2026-09-22
Judges' grilling of accused men leads to sex assault and dangerous driving cases being overturned
2026-09-20
Jura Energy Corporation Provides Clarification Regarding Media Reports Concerning Its Petroleum Rights in Pakistan
2026-09-19
New details emerge about Toronto's guns-for-hire and the 'crash-out mission" that sparked the Project South investigation
2026-09-17
UPDATE: Osisko Critical Minerals Corporation Announces C$100 Million Private Placement of Special Warrants
2026-09-17
Alabama set to execute man for pawn shop killings months after his nitrogen gas execution blocked
2026-09-04
Orca Corrects Q3 Quarterly Dividend Announcement

Who wrote this

No reporter is named on this article, beyond the feed's “GlobeNewswire, Inc.”.

Topics

GLOBE NEWSWIRE NEXG NexGold NexGold Mining Corp. TORONTO

Subjects

NexGold ORG · 2× GLOBE NEWSWIRE ORG · 1× Kevin Bullock PERSON · 1× NEXG ORG · 1× NXGCF ORG · 1× NexGold Mining Corp. ORG · 1× TORONTO GPE · 1×

Narrative

The results presented in this news release include 3,603 metres of diamond drilling in 10 drill holes (GL-26-031 to GL-26-040) (Figures 1, 2 and 3; Tables 1 and 2). Selected drill intersections from diamond drill holes at the Goldlund Deposit in this news release are further detailed in Table 1 and include: - 14.07 g/t gold over 7.0 metres (from 187.0 to 194.0 metres), including 95.70 g/t gold over 1.0 metres in drill hole GL-26-034; additionally, 9.76 g/t gold over 8.0 metres (from 170.0 to 178.0 metres), including 74.10 g/t gold over 1.0 metres, 2.84 g/t gold over 13.0 metres (from 205.0 to 218.0 metres), including 21.70 g/t gold over 1.2 metres, 53.00 g/t gold over 1.0 metres (from 74.0 to 75.0 metres), and 0.55 g/t gold over 29.7 metres (from 243.5 to 273.2 metres) including 7.61 g/t gold over 1.2 metres in the same hole; - 2.23 g/t gold over 15.5 metres (from 123.5 to 139.0 metres), including 40.50 g/t gold over 0.5 metres and 3.97 g/t gold over 0.8 metres in drill hole GL-26-032; additionally, 1.49 g/t gold over 9.1 metres (from 433.9 to 443.0 metres), including 6.50 g/t gold over 0.7 metres and 9.25 g/t gold over 0.5 metres in the same hole; - 1.25 g/t gold over 22.0 metres (from 166.0 to 188.0 metres), including 40.50 g/t gold over 0.5 metres in drill hole GL-26-033; additionally, 0.84 g/t gold over 42.8 metres (from 245.7 to 288.5 metres), including 7.04 g/t gold over 1.3 metres and 3.91 g/t gold over 1.0 metres in the same hole; and - 1.51 g/t gold over 17.1 metres (from 218.9 to 236.0 metres), including 13.80 g/t gold over 0.6 metres and 5.98 g/t gold over 1.0 metres in drill hole GL-26-039A; additionally, 2.04 g/t gold over 6.2 metres (from 196.2 to 202.4 metres), including 15.50 g/t gold over 0.6 metres in the same hole. Kevin Bullock, President, CEO & Director of NexGold, commented: “I am pleased with the additional assay results from our drill program at Goldlund.
framing: assertive · carried by 1 article(s) · first seen 2026-09-23
🔮 Our continued drilling progress at Goldlund further supports our objectives for this program - to infill and test the extension of mineralization in Zone 4 - which is expected to contribute to refinement of our geological model and may inform future Mineral Resource assessments.

Claims (42 extracted, 6 hedged)

NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to provide additional results from its diamond drilling program at the Company’s Goliath Gold Complex, which includes the Goliath, Goldlund and Miller Deposits. asserted
which → please → Deposits
The drill program, of which approximately 31,971 metres of the expanded 35-000 metre program have been completed, is focused on infilling and testing the extension of mineralization within Zone 4 of the Goldlund Deposit. asserted
metres → expand → Deposit
The results presented in this news release include 3,603 metres of diamond drilling in 10 drill holes (GL-26-031 to GL-26-040) (Figures 1, 2 and 3; Tables 1 and 2). Selected drill intersections from diamond drill holes at the Goldlund Deposit in this news release are further detailed in Table 1 and include: - 14.07 g/t gold over 7.0 metres (from 187.0 to 194.0 metres), including 95.70 g/t gold over 1.0 metres in drill hole GL-26-034; additionally, 9.76 g/t gold over 8.0 metres (from 170.0 to 178.0 metres), including 74.10 g/t gold over 1.0 metres, 2.84 g/t gold over 13.0 metres (from 205.0 to 218.0 metres), including 21.70 g/t gold over 1.2 metres, 53.00 g/t gold over 1.0 metres (from 74.0 to 75.0 metres), and 0.55 g/t gold over 29.7 metres (from 243.5 to 273.2 metres) including 7.61 g/t gold over 1.2 metres in the same hole; - 2.23 g/t gold over 15.5 metres (from 123.5 to 139.0 metres), including 40.50 g/t gold over 0.5 metres and 3.97 g/t gold over 0.8 metres in drill hole GL-26-032; additionally, 1.49 g/t gold over 9.1 metres (from 433.9 to 443.0 metres), including 6.50 g/t gold over 0.7 metres and 9.25 g/t gold over 0.5 metres in the same hole; - 1.25 g/t gold over 22.0 metres (from 166.0 to 188.0 metres), including 40.50 g/t gold over 0.5 metres in drill hole GL-26-033; additionally, 0.84 g/t gold over 42.8 metres (from 245.7 to 288.5 metres), including 7.04 g/t gold over 1.3 metres and 3.91 g/t gold over 1.0 metres in the same hole; and - 1.51 g/t gold over 17.1 metres (from 218.9 to 236.0 metres), including 13.80 g/t gold over 0.6 metres and 5.98 g/t gold over 1.0 metres in drill hole GL-26-039A; additionally, 2.04 g/t gold over 6.2 metres (from 196.2 to 202.4 metres), including 15.50 g/t gold over 0.6 metres in the same hole. Kevin Bullock, President, CEO & Director of NexGold, commented: “I am pleased with the additional assay results from our drill program at Goldlund. asserted
I → present → Goldlund
This program continues to demonstrate grade continuity at depth, but within reach of a potential open pit. asserted
program → continue → pit
Grade tenor and thicknesses continue to build confidence that mineralization continues at depth and is consistent with previous drill results. asserted
mineralization → continue → results
Our continued drilling progress at Goldlund further supports our objectives for this program - to infill and test the extension of mineralization in Zone 4 - which is expected to contribute to refinement of our geological model and may inform future Mineral Resource assessments. uncertain
which → support → assessments
We expect to complete the balance of the 35,000-metre program by the end of 2026 and will continue to provide updates as results become available. asserted
results → expect → updates
” Mineralization at the Goldlund Deposit is generally characterized by quartz stockwork veining within sub-vertical granodiorite sills. asserted
Mineralization → characterize → sills
Zone 4 at the Goldlund Deposit includes broad intervals of mineralized intermediate-mafic volcanic rocks with multiple porphyry and granodiorite intrusions. asserted
Zone → include → intrusions
The drill results summarized in this news release, together with previously announced drill results, provide additional support and information relevant to the interpretation of grade continuity within Zone 4. asserted
results → summarize → Zone
These results are expected to contribute to ongoing refinement of the geological model and may support future evaluation of Mineral Resource classification, subject to additional drilling, data verification, and completion of further technical studies. uncertain
results → expect → studies
Drill holes completed as part of this program have been distributed across the strike extent of Zone 4, with the holes highlighted in this news release located from the central to southeastern portion of the zone. asserted
holes → complete → zone
The results provide additional information supporting the Company’s current geological interpretation of mineralization within Zone 4 and provide additional information regarding the continuity of mineralization between drill sections. asserted
results → provide → sections
Additional drilling is planned to further evaluate mineralization along strike and down dip and to inform Mineral Resource assessments. asserted
drilling → plan → assessments
Reported intervals are drilled core lengths and do not indicate true widths. asserted
intervals → report → widths
True widths typically vary from 50 to 75% of the interval length, except for hole GL-26-033, where true width is estimated from 25 to 50% of interval length due to the steeper inclination drilled. 2. asserted
width → vary → inclination
For duplicate samples, the average grade was used to calculate the intersection grade. asserted
grade → use → grade
Drill hole locations reported as Universal Transverse Mercator NAD83 Zone 15N coordinates QA / QC The Company has implemented a quality assurance and quality control (“QA/QC”) program to ensure sampling and analysis of all exploration work is conducted in accordance with the CIM Exploration Best Practices Guidelines. asserted
sampling → report → Guidelines
Drill core is sawed in half with one-half of the core sample dispatched to the Activation Laboratories Ltd. laboratory in Dryden, Ontario. asserted
half → saw → Dryden
The other half of the core is retained for future assay verification and/or metallurgical testing. asserted
half → retain → verification
Other QA/QC procedures include the insertion of blanks and Canadian Reference Standards for every tenth sample in the sample stream. asserted
procedures → include → stream
A quarter core duplicate is assayed every 20th sample. asserted
duplicate → assay → ?
The laboratory, which is independent of the Company, has its own QA/QC protocols, running standards and blanks with duplicate samples in each batch stream. asserted
which → have → stream
Additional checks are routinely run on anomalous values including gravimetric analysis and pulp metallic screen fire assays. asserted
checks → run → analysis
Gold analysis is conducted by lead collection, fire assay with atomic absorption, and/or gravimetric finish on a 50-gram sample. asserted
analysis → conduct → sample
Check assays are conducted at a secondary independent ISO certified laboratory (in this case AGAT Laboratories located in Mississauga, Ontario) following the completion of a program. asserted
assays → conduct → program
Qualified Person Paul McNeill, P.Geo., VP Exploration of NexGold, is a “Qualified Person” as defined under National Instrument 43-101 – Standards of Disclosure for Mineral Projects. asserted
McNeill → define → Projects
Mr. McNeill has reviewed the available data, composites and QA/QC information related to the drill program and approved the scientific and technical disclosure contained in this news release on behalf of NexGold. asserted
McNeill → review → NexGold
NexGold is a gold-focused company with assets in Canada and Alaska, including the Goldboro Gold Project in Nova Scotia, the Goliath Gold Complex (which includes the Goliath, Goldlund and Miller deposits) in Northwestern Ontario, and additional exploration projects across Canada. asserted
which → focus → Canada
NexGold also holds a 100% interest in the high-grade Niblack copper-gold-zinc-silver VMS project in southeast Alaska. asserted
NexGold → hold → Alaska
NexGold is committed to ongoing, meaningful engagement with regional communities and Indigenous Nations to support sustainable development, safe operations, and shared economic and social benefits. asserted
NexGold → commit → development
Further details about NexGold, including a Feasibility Study for the Goldboro Gold Project and a Prefeasibility Study for the Goliath Gold Complex, are available under the Company’s issuer profile on www.sedarplus.ca and on NexGold’s website at www.nexgold.com. Contact: Cautionary Note Regarding Forward-Looking Information This news release contains “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of applicable United States securities laws (collectively, “forward-looking information”). Forward-looking information relates to future events or future performance and reflects management’s expectations and assumptions as of the date of this news release. asserted
information → include → release
Forward-looking information contained in this news release includes, but is not limited to statements regarding the Company’s plans and objectives for the Goldlund drill program; the expected completion of the 35,000-metre drill program by the end of 2026; planned drilling to evaluate mineralization along strike and down dip; the contribution of drilling results to refinement of the Company’s geological model; the potential use of drilling results in future Mineral Resource assessments and evaluation of Mineral Resource classification; and the timing and availability of additional drilling results. asserted
information → contain → results
Forward-looking information is often, but not always, identified by words and phrases such as “plans”, “expects”, “is expected”, “scheduled”, “estimates”, “intends”, “anticipates”, “believes”, “targets”, “potential”, “may”, “could”, “should”, “would”, “will” and similar words and expressions. uncertain
information → identify → plans
Forward-looking information contained in this news release is based on certain assumptions that management considers reasonable as of the date of this news release, including that exploration activities will proceed on the anticipated schedules; that contractors, personnel, equipment and supplies necessary to complete the drill program will remain available on acceptable terms; that assay and other results will be received within anticipated timeframes; that the Company’s geological interpretations based on existing information are reasonable; and that the Company will have sufficient financial resources to complete its planned exploration activities. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to differ materially from those expressed or implied by such forward-looking information. uncertain
results → contain → information
These risks and uncertainties include, among others: risks that exploration activities, including drilling, may not accurately predict the continuity, grade or extent of mineralization; that future drilling results may not support the Company’s geological interpretations or changes to Mineral Resources estimates or classifications; delays in drilling, receipt of assay results or other exploration activities; the availability of financing, personnel, equipment and contractors; fluctuations in commodity prices, exchange rates and market conditions; environmental, Indigenous, community, permitting and regulatory risks; health and safety risks; and other risks described in the Company’s public disclosure documents available under its profile on SEDAR+ at www.sedarplus.ca. uncertain
results → include → www.sedarplus.ca
Although the Company believes that the assumptions and expectations reflected in the forward-looking information are reasonable, there can be no assurance that such information will prove to be accurate, and actual results and future events may differ materially from those anticipated. uncertain
results → believe → those
Readers should therefore not place undue reliance on forward-looking information. asserted
Readers → place → information
The forward-looking information contained in this news release is provided as of the date hereof, and the Company undertakes no obligation to update or revise such forward-looking information except as required by applicable securities laws. asserted
Company → look → laws
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. asserted
term → define → release
…and 2 more, not listed.
💬Give feedback
🕘History 🎫Support