Orezone Announces Life-of-Mine Plan for Casa Berardi Operations

Toronto Star · collected 2026-09-15 · by GlobeNewswire, Inc.
Read the original at Toronto Star ↗

Summary

Orezone Gold Corporation has unveiled a Life-of-Mine plan for its Casa Berardi gold mine in Quebec, Canada, which outlines a 14-year production period from 2027 to 2040 with an estimated total of 1.63 million ounces of gold. The average annual production is projected at 116,000 ounces, with costs of $1,877 per ounce in All-In Sustaining Costs (AISC). Orezone also plans to increase exploration activities to further boost production and reduce costs over time.
Written by the local model on 2026-09-15, using this article's own text rather than the other coverage of the same event (that is the story summary below).

Signals How these are calculated →

Claims extracted
140
claim-shaped sentences
Uncertain
6%
8 of 140 hedged
Leaning
not political
takes no side on a contested political question
Correction & hedging signals
61.9
corrections and hedging in what we collected; not a measure of accuracy
Outlets on this story
1
Economy/Business
Narrative spread
1
articles carrying this framing
Analyzed 2026-09-15 · how these are computed

AI analysis (generated at analysis time, not now)

Story summary

On September 15, 2026, Orezone Gold Corporation announced an updated life-of-mine plan for its recently acquired Casa Berardi gold mine in Quebec, Canada. The plan outlines a 14-year mining lifespan from 2027 to 2040, with projected total production of 1,630,000 ounces of gold and an average annual production rate of 116,000 ounces at all-in sustaining costs (AISC) of $1,877 per ounce. During the years 2030-2038, the plan projects higher annual production of 132,000 ounces, with AISC decreasing to $1,776 per ounce. The base case after-tax net present value (NPV) at a 5% discount rate is estimated at $1.05 billion under consensus gold prices; this increases to $1.43 billion if the spot price of gold reaches $4,350 per ounce. Orezone also plans to ramp up exploration activities, aiming for 100,000 metres of drilling annually, with multiple fronts offering opportunities to boost underground grades and reduce costs further.

Written for “Orezone Mining Plans” on 2026-09-17, grounded in this article and the 0 other(s) covering the same event.
Why this leaning score
This article does not take a side on a contested political question, so it has no leaning score. That is an answer rather than a gap: a match report or a rescue can be warmly or critically written without being left or right, and scoring it anyway is how approval of a subject gets recorded as a political position.
No political leaning scored for article 10157 · logged 2026-09-15

Story

📰 Orezone Mining Plans
Economy/Business · 1 article(s) covering the same event. This is the one the site leads with.

How this is being covered How these are calculated →

Article leaning vs. publisher reliability
Source leaning vs. consistency

Compared with similar articles

This article reads unscored and hedges 6% of its claims. Each row says how that neighbour differs.
Toronto Star
⚖️ leaning not scored 🔴 7% hedged 4 of 56 📰 publisher trust 62
“The articles describe different company activities related to gold exploration and production, not the same specific incident.”

Publisher

Toronto Star · 849 article(s) · 1 correction(s) detected
Running correction rate · 1 correction(s)
2026-09-04
Orca Corrects Q3 Quarterly Dividend Announcement

Who wrote this

No reporter is named on this article, beyond the feed's “GlobeNewswire, Inc.”.

Topics

Casa Berardi Company Life-of-Mine Orezone Quebec

Subjects

Casa Berardi ORG · 8× Life-of-Mine ORG · 6× Orezone ORG · 6× Quebec GPE · 3× Company ORG · 2× British Columbia GPE · 1× Canada GPE · 1× ORZCF ORG · 1× Orezone Gold Corporation ORG · 1× VANCOUVER GPE · 1×

Narrative

Forward looking statements in this news release include, but are not limited to, statements regarding: the Casa Berardi Life-of-Mine plan, including the anticipated mine life, production profile, gold production, head grades, recovery rates, throughput, mining rates, operating costs, AISC, capital expenditures, cash flows and net present value; the timing and sequencing of underground and open pit mining; the re-establishment of historical underground production rates; the continuation of operations at the West Mine and the recommencement of operations at the East Mine; planned underground development, waste stripping, equipment purchases and contractor activities; the timing and receipt of required permits and approvals, including those relating to the F134 and F160 pits and the Principal and WMCP pits and associated infrastructure; the capacity and future use of the tailings storage facility and exhausted open pits for tailings deposition; the potential benefits of operational improvements, increased mill throughput, improved recoveries and grade control; the timing, scope and results of exploration and drilling programs, including the planned ramp-up to 100,000 metres of drilling annually; the potential to expand mineral resources, discover new zones, delineate higher-grade underground mineralization, add mineralized material to future mine plans, increase production and reduce costs; and the timing of the preliminary economic assessment for Heva-Hosco.
framing: assertive · carried by 1 article(s) · first seen 2026-09-15
🔮 will be conducted via both underground and open pit, with ore processed at the Casa Berardi mill.
2026-09-15 · Toronto Star
Orezone Announces Life-of-Mine Plan for Casa Berardi Operations · assertive framing

Claims (140 extracted, 8 hedged)

All dollar amounts are in USD unless otherwise indicated VANCOUVER, British Columbia, Sept. 15, 2026 (GLOBE NEWSWIRE) — asserted
amounts → indicate → USD
Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to announce an updated Life-of-Mine plan for its recently acquired Casa Berardi gold mine, located in Quebec, Canada. asserted
Corporation → please → Quebec
Casa Berardi Life-of-Mine Plan Highlights - 14-year mine life (2027-2040) with 1,630,000 ounces of total gold production - Life-of-Mine average annual gold production of 116,000 ounces at AISC1 of $1,877 per ounce - Years 2030-2038 average annual gold production of 132,000 ounces at AISC of $1,776 per ounce - After-tax NPV5%2 of $1.05 billion at Base Case consensus gold prices3 - After-tax NPV5% increases to $1.43 billion at $4,350 per ounce spot gold price4 - Orezone has reinitiated exploration at Casa Berardi, currently ramping-up drilling to 100,000 metres per annum. asserted
Orezone → reinitiate → annum
Multiple actionable exploration fronts, with clear opportunity to increase underground grades, expand production and further reduce costs Patrick Downey, President and CEO, commented “The release of the Casa Berardi Life-of-Mine plan is a significant milestone for Orezone. asserted
release → increase → Orezone
The result of the Life-of-Mine plan clearly underscores the opportunity and value proposition identified by Orezone in acquiring the Casa Berardi Mine. asserted
result → underscore → Mine
Its transformational acquisition positions the Company as an established multi-asset producer, with a significant and fully funded growth profile. asserted
acquisition → position → profile
The Life-of-Mine plan highlights a robust 14-year mine life, with average annual production of 116,000 ounces at an All-In Sustaining Cost (“AISC”) of US$1,877 per ounce. asserted
plan → highlight → ounce
The initial years of the plan are marked by a ramp-up phase, with investments in new equipment, underground development and open pit waste stripping, supporting an increase in average annual production to a sustained 132,000 ounces. asserted
investments → mark → ounces
The Company views this Life-of-Mine plan as an excellent baseline, which with ongoing optimization and exploration, we fully expect to further increase the production profile and lower costs. asserted
we → view → costs
This upside potential has already been well demonstrated, with the Casa Berardi mill continuously operating at rates above that assumed in the Life-of-Mine plan, and initial exploration results highlighting the near-term potential to delineate higher-grade underground zones of near-surface mineralization. asserted
mill → demonstrate → mineralization
The Casa Berardi Life-of-Mine plan also marks an important milestone in Orezone’s expansion into Quebec, the foundation of which is the support of our dedicated employees, community partners and First Nations. asserted
foundation → mark → employees
The Company looks to continue this momentum with the release of a PEA study on its Heva-Hosco development project, located along the prolific Cadillac Larder-Lake Break in Quebec, in the fourth quarter.” asserted
Company → look → quarter
The updated Casa Berardi mineral resource estimates have an effective date of June 30, 2026. asserted
estimates → update → June
The mineral resource excludes material mined up to the effective date, as well as excluding stockpiles. Mine Plan and Production Overview The Casa Berardi Life-of-Mine plan comprises 14 years of continuous operations from 2027 to 2040, producing a total of 1,630,000 ounces of gold. asserted
plan → exclude → gold
will be conducted via both underground and open pit, with ore processed at the Casa Berardi mill. asserted
ore → conduct → mill
The Casa Berardi Life-of-Mine plan includes Inferred Mineral Resources, and as such is classified as a Preliminary Economic Assessment (“PEA”)6. asserted
plan → include → Assessment
No mineral reserves are defined for Casa Berardi. asserted
reserves → define → Berardi
The mine plan was completed by BBA Consultants under guidance from Orezone. asserted
plan → complete → Orezone
The open pit and underground mine plans were evaluated using DeswikTM algorithms to create optimal mineable shapes based on economic and technical input parameters including mine dilution and recovery. asserted
plans → evaluate → dilution
Underground stope design parameters were based on current operating experience, with stopes that were uneconomic due to distance from infrastructure excluded from the Life-of-Mine plan. asserted
that → base → plan
Underground Mining Casa Berardi has a long history of underground mining, dating back to the late 1980s. asserted
Berardi → have → 1980s
In recent years, mine planning by the previous operator prioritized a shift to open pit operations, resulting in a sharp decrease in investment in underground development, equipment and exploration. asserted
planning → prioritize → development
Orezone’s Life-of-Mine plan is centered on re-establishing historical underground production rates at Casa Berardi, which based on the current mineral resource and sustained investment, supports a 12-year underground mine life. asserted
which → center → life
The underground mine plan is based on continuous operations at the currently active West Mine (2027-2038), with the past producing East Mine re-commencing operations within three years (2029-2038). asserted
past → base → years
Underground mining practices are well established at Casa Berardi, using conventional underground equipment and long-hole open stoping methods. asserted
practices → establish → equipment
Mining at Casa Berardi is owner-operated, with a mining contractor recently mobilized to increase lateral development rates. asserted
contractor → operate → rates
Several new pieces of underground mining equipment have recently been delivered to site, with the staged procurement of new equipment continuing through 2029 as underground mining rates are increased. asserted
rates → deliver → 2029
The West Mine is accessed via a hoist or a ramp down to the 1,080m level, with ore brought to surface and transported 5 kilometres to the Casa Berardi mill utilizing 60t trucks. asserted
Mine → access → trucks
Access to the East Mine is provided by a separate ramp, collared near the Casa Berardi mill, which has been developed down to the 730m level. asserted
which → provide → level
Active mining in the East Mine ceased in 2023 and work has now commenced on the re-opening of the East Mine access and ramp in anticipation of re-commencement of operations in 2029. asserted
work → cease → 2029
Open Pit Mining Mining is carried out using conventional drill, blast, load and haul surface mining methods, with an owner-operated fleet. asserted
Mining → carry → fleet
A stockpiling strategy is employed to prioritize delivery of the highest-grade ore to the mill, with stockpiles developed to maintain consistent mill throughput during waste stripping phases. asserted
stockpiles → employ → phases
The Life-of-Mine plan comprises four separate open pits. asserted
plan → comprise → pits
The current F160 pit phase is scheduled to be complete at the end of 2026, with open pit production shifting to the F134 pit for 2027 and 2028. asserted
production → schedule → 2027
The F160 pit expansion waste cutback is scheduled to commence in late 2027, with ore mining from the F160 pit to resume in late 2028 and continue through to 2031. asserted
mining → schedule → 2031
The Principal (2031-2038) and WMCP (2034-2040) pits will be mined thereafter. asserted
pits → mine → ?
The F134 Phase 1 pit is permitted, with the Phase 2 permit amendment to be submitted in the fourth quarter. asserted
amendment → permit → quarter
The F160 pit expansion will require a permit amendment, which will be submitted in the fourth quarter as well. asserted
which → require → quarter
This work has commenced and will be advanced over the coming years. asserted
work → commence → years
Processing The Casa Berardi processing facility has a nameplate capacity of 3,730tpd. asserted
facility → process → 3,730tpd
…and 100 more, not listed.
💬 Give feedback
🕘 History 🎫 Support