Photo via Toronto Star

Feds approve FortisBC's Tilbury LNG expansion under 'one project, one review'

Read the original at Toronto Star ↗
Cite

The Canadian Press. (2026, September 22). Feds approve FortisBC's Tilbury LNG expansion under 'one project, one review'. Toronto Star. https://www.thestar.com/news/canada/feds-approve-fortisbc-s-tilbury-lng-expansion-under-one-project-one-review/article_9df82a3f-1564-5b0f-b7cf-701c411382e1.html

Dated when The Aporia collected the article, usually within hours of publication. Check the original for its exact date and byline.

Toronto Star · collected 2026-09-22 · by The Canadian Press

Quick Summary

The federal government has approved FortisBC’s expansion of the Tilbury LNG facility in Delta, B.C., under the "one project, one review" principle. The project includes adding a large storage tank and equipment to produce up to 7,700 tonnes of liquefied natural gas per day. It is expected to generate 6,200 full-time-equivalent years of employment during construction and create 100 permanent jobs, contributing $1.7 billion to the provincial GDP. However, it has faced opposition from B.C.’s Minister of Emergency Management and Climate Readiness, Kelly Greene, who cited safety concerns.
Written by AI on 2026-09-22, from this article's own text only (the story summary below draws on all the coverage).
See how they differ ↓

AI analysis

Story summary

On Monday, the federal government approved FortisBC's expansion of the Tilbury LNG facility on Tilbury Island in Delta, British Columbia, under a "one project, one review" principle. The B.C. government had previously issued an environmental assessment certificate to FortisBC for the project. Despite safety concerns raised by Minister Kelly Greene of emergency management and climate readiness last July, the federal approval was given based on potential economic benefits outweighing adverse effects. The expansion includes adding a large new storage tank and equipment capable of producing up to 7,700 tonnes of liquefied natural gas per day. Environment Minister Julie Dabrusin stated that this project exemplifies job creation and environmental protection while advancing reconciliation with Indigenous groups, noting the involvement of 12 Indigenous nations in consensus-building processes. The expansion is projected to generate 6,200 full-time-equivalent years of employment during construction and create 100 permanent jobs, contributing up to $1.7 billion to B.C.'s GDP during construction.

Written for “Tilbury LNG Expansion Approved” on 2026-11-22, grounded in this article and the 1 other(s) covering the same event.

How they differ

2 outlets covered “Tilbury LNG Expansion Approved”.

What each outlet says

One AI summary per outlet of its latest article on this story, written from that article alone and checked against it. Open the article for the outlet's own words.

Toronto StarThis outlet22 Sep

The federal government has approved FortisBC’s expansion of the Tilbury LNG facility in Delta, B.C., under the "one project, one review" principle. The project includes adding a large storage tank and equipment to produce up to 7,700 tonnes of liquefied natural gas per day. It is expected to generate 6,200 full-time-equivalent years of employment during construction and create 100 permanent jobs, contributing $1.7…

Feds approve FortisBC's Tilbury LNG expansion under 'one project, one review' (this article)
CBC22 Sep

The federal government has approved the expansion of the Tilbury LNG facility in Delta, B.C., under the "one project, one review" principle. The project includes adding a large storage tank to increase daily production by up to 7,700 tonnes of liquefied natural gas. Proponents claim it will generate 6,200 full-time jobs during construction and 100 permanent positions while contributing $1.7 billion to the provincial…

Tilbury LNG facility in Delta, B.C. gets greenlight for expansion →

Compared with similar articles

This article reads leans right and hedges 7% of its claims. Each row says how that neighbour differs.
CBC News
Leans right Hedges 2 of 15 claims Outlet record 70/100
Toronto Star
Leans strongly right further right than this Hedges 0 of 28 claims Outlet record 65/100
“Article A discusses a new bill proposed by the government to change environmental and labour rules, while Article B reports on the approval of an LNG project expansion under a different regulatory principle.”

Story

Tilbury LNG Expansion Approved
Economy/Business · 2 article(s) covering the same event. See how they differ ↑
How this article was measured signals, leaning charts, publisher record, byline, topics and claims

Signals How these are calculated →

Claims extracted
15
sentences that state something as happening or true
Uncertain
7%
1 of 15 hedged ("reportedly", "may", "according to")
Leaning
Leans right
of the writing, not the subject · beta estimate
Publisher signals
65/100
Toronto Star's corrections and hedging, across everything collected from it. Not a measure of accuracy.
Outlets on this story
2
Economy/Business
Same framing elsewhere
1
articles that frame the event the way this one does
Analyzed 2026-09-22 · how these are computed

How this is being covered How these are calculated →

Article leaning vs. publisher reliability
Source leaning vs. consistency

Publisher

Toronto Star · 16802 article(s) · 32 correction(s) detected
Running correction rate · 32 correction(s)
2026-11-17
Correction
2026-10-26
Correction
2026-10-24
Correction
2026-10-07
Correction
2026-09-24
Correction

Who wrote this

The Canadian Press
660 article(s) here · 1 carrying a prediction
Investors will be watching to see if the sell-off continues this week, which will see trading on U.S. markets interrupted by the U.S. Thanksgiving holiday on Thursday.
The Liberals gained a third seat in the legislature in May after Druhan, the Independent member for Lunenburg West, announced she would join the Liberals and contest the party’s leadership.
2026-11-21 · assertive framing · Nova Scotia Liberals elect Becky Druhan to lead party
The Supreme Court of Canada will issue a landmark decision next Friday on Quebec’s secularism law, known as Bill 21.
The province says the project will see the construction of two docking berths, a transload yard to transfer cargo from ships to rail, and other infrastructure to move goods between northern and southern Ontario, Quebec and overseas markets.
The province says the project will see the construction of two docking berths, a transload yard to transfer cargo from ships to rail, and other infrastructure to move goods between northern and southern Ontario, Quebec and overseas markets.
Members of the Ontario Liberal party will learn Saturday who their next leader will be, after months of campaigning and weeks of voting.
A 30th Nova Scotia long term care home will be joining the ongoing strike that began 11 days ago.
The team will give an update on his condition in two weeks.
Cecil Clarke, mayor of the Cape Breton Regional Municipality, said the explosion and fire destroyed a pizza shop on the ground floor of the building, which had apartments in the two storeys above it.
Mustin says the members overwhelmingly supported the strike mandates “because they are frustrated by years of chronic underfunding and deteriorating learning and working conditions.” Bargaining at both negotiating tables for teachers as well as education workers is set to resume at the end of this month.
Wire or desk byline, not an individual reporter.
Also by The Canadian Press
Nothing else under this byline is closely related to this article, so these are simply their most recent.
All 660 articles by The Canadian Press →

Topics

B.C. Delta FortisBC OTTAWA Tilbury Island

Subjects

B.C. GPE · 4× FortisBC ORG · 4× Greene PERSON · 2× Delta ORG · 1× Federal Environment ORG · 1× Julie Dabrusin PERSON · 1× Kelly Greene PERSON · 1× NDP ORG · 1× OTTAWA GPE · 1× Tilbury Island GPE · 1×

Narrative

The province said in a statement on Monday that the environmental assessment certificate included “18 legally binding conditions related to air quality, wildlife protection, greenhouse-gas reduction, health and emergency planning, and ongoing monitoring of impacts to First Nations.” It said the Environmental Assessment Office sought consensus with 12 Indigenous nations, while 13 other Indigenous groups were informed of key milestones.
framing: assertive · carried by 1 article(s) · first seen 2026-09-22
The province says the project could generate 6,200 full-time-equivalent years of employment during construction and 100 permanent jobs, and contribute up to $1.7 billion to provincial GDP during construction.

Claims (15 extracted, 1 hedged)

The federal government has approved expansion of the Tilbury LNG facility in Delta, B.C., saying potential adverse effects are justified by the project’s benefits. asserted
effects → approve → benefits
Monday’s approval under the “one project, one review” principle came immediately after the B.C. government issued an environmental assessment certificate to FortisBC for the project on Tilbury Island in the Fraser River. asserted
government → come → River
The province says the project could generate 6,200 full-time-equivalent years of employment during construction and 100 permanent jobs, and contribute up to $1.7 billion to provincial GDP during construction. uncertain
project → say → construction
Federal Environment Minister Julie Dabrusin says in a statement the project shows how to “create jobs and grow the economy while protecting the environment and advancing reconciliation.” The project involves adding a large new storage tank and equipment to produce up to 7,700 tonnes of liquefied natural gas per day. asserted
project → say → day
But it has faced opposition from within the B.C. government, with Kelly Greene, minister of emergency management and climate readiness, saying in July she was “disappointed” by FortisBC’s decision to move forward with the project, citing safety concerns. asserted
she → face → concerns
“For months, I have listened to safety concerns from people in my community. asserted
I → listen → community
I raised those issues with government at every opportunity. asserted
I → raise → opportunity
I am disappointed with FortisBC’s decision, as I know many of those I represent will be,” she said at the time. asserted
she → disappoint → time
Greene said her opposition had remained unchanged since before she was elected to the legislature, while NDP Premier David Eby said his government has a “big tent,” which allowed Greene to criticize the plan. asserted
Greene → say → plan
Federal Energy Minister Tim Hodgson called the approval “a step forward in our mission to get major nation-building projects built faster.” asserted
projects → call → mission
“Today’s approval of the Tilbury Phase 2 LNG expansion project will power BC Ferries with cleaner fuel, strengthen Canada’s energy security and create economic opportunities for British Columbians,” he said on social media on Monday. asserted
he → power → Monday
The B.C. government had touted the expansion as helping meet rising demand for LNG at the Port of Vancouver and improving access to fuel for vessels that travel the coast and across the Pacific. asserted
that → tout → Pacific
The province said in a statement on Monday that the environmental assessment certificate included “18 legally binding conditions related to air quality, wildlife protection, greenhouse-gas reduction, health and emergency planning, and ongoing monitoring of impacts to First Nations.” It said the Environmental Assessment Office sought consensus with 12 Indigenous nations, while 13 other Indigenous groups were informed of key milestones. asserted
groups → say → milestones
The assessment process was initiated in February 2020, but the province said it was delayed by the COVID-19 pandemic, and FortisBC submitted a revised application in February 2026. asserted
FortisBC → initiate → February
This report by The Canadian Press was first published Sept. 21, 2026. asserted
report → publish → Press
Give feedback · no sign-in needed

No sign-in needed for now. Your note is sent without a name, so it cannot be answered.

History Support